Welcome to KillTest.com

IBM QRadar SIEM V7.3.2 Deployment C1000-055 Exam Guides

Oct 29,2021

IBM QRadar SIEM V7.3.2 Deployment C1000-055 exam guides is available. IBM C1000-055 exam is known as a required test for IBM Certified Deployment Professional-IBM QRadar SIEM V7.3.2 certification, which is intended for deployment professionals who are responsible for the planning, installation, configuration, performance optimization, tuning, troubleshooting, and system administration of an IBM QRadar SIEM V7.3.2 deployment. Killtest new released IBM certification C1000-055 exam guides are the best preparation material.

 

IBM QRadar SIEM V7.3.2 Deployment C1000-055 Exam Guides

 

IBM QRadar SIEM V7.3.2 Deployment C1000-055 Exam


IBM C1000-055 exam information is helpful for you to prepare for the test. 
Number of questions: 60
Number of questions to pass: 37
Time allowed: 120 mins
Available Languages: English, Japanese

IBM Certification C1000-055 Exam Topics


List C1000-055 IBM QRadar SIEM V7.3.2 Deployment exam topics below. 
Section 1: Deployment objectives and Use cases 10%
Section 2: Architecture and Sizing 24%
Section 3: Installation and Configuration 20%
Section 4: Event and flow integration 15%
Section 5: Environment and threat data integration 13%
Section 6: System Performance and Offense Tuning 8%
Section 7: Troubleshooting 10%

New released IBM certification C1000-055 exam guides are the best material for you to study the above IBM QRadar SIEM V7.3.2 Deployment topics. Share some IBM C1000-055 exam demo questions and answers below. 

A deployment professional needs to include a network inspection device in a banking organization as per the new security guidelines. Real time threat investigation has to be done along with the post-incident analysis. A QRadar Incident Forensics has been included in the design for postincident forensic analysis. Which devices should be chosen for the realtime analysis?
A. Flow Collector (FC) and Flow Processor (FP)
B. Flow Collector (FC) and QRadar Network Insight (QNI)
C. QRadar Network Insight (QNI) and Flow Processor (FP)
D. Network PCAP and Flow Processor (FP)
Answer: D

A deployment professional is about to execute Server Discovery to populate the Host Definition Building Blocks. The deployment professional is working in a monitored environment and does not wish to set off any network scanner alarms. What step should the deployment professional take to ensure that good results are returned and that no alarms are raised?
A. Ensure that the flow sources are configured correctly and collecting data
B. Ensure that events from the relevant servers are being collected successfully
C. Set the 'Passive discovery' flag in Advanced System Settings in the Admin tab
D. Warn the network monitoring team that QRadar is about to run a network port scan
Answer: C

A company has a large network with multiple segments. The manufacturing area network and the research and development (R&D) area network are separated from the product area network, and the customer does not want to run scanners through firewalls. A deployment professional has been tasked with proposing a strategy to ensure vulnerability assessment operations cover all company assets. In addition to a scanner in the production area network, which option should the deployment professional follow?
A. Deploy a hosted IBM scanner appliance in the manufacturing area network and in the R&D area network.
B. Deploy a vulnerability manager on a QRadar Managed Host in the manufacturing area network and in the R&D area network.
C. Deploy a vulnerability processor on a QRadar Managed Host in the manufacturing area network and in the R&D area network.
D. Deploy a vulnerability scanner on a QRadar Managed Host in the manufacturing area network and in the R&D area network.
Answer: C

During an initial deployment, three retention buckets (longret, midret. testret) were configured with the following characteristics, being (X) the number of the bucket:
longret (1): keep data in this bucket for 2 years. Delete when storage is needed.
midret (2): keep data in this bucket for 6 months. Delete when storage is needed.
testret (3): keep data in this bucket for 3 days. Delete immediately after expiration
Default (0) retention bucket has a 3 months / delete immediately policy.
During testing last week, a significant amount of test data has been mistakenly categorized as
"longret". This bucket does not contain any other important information. Everything else, including
some important data, has been saved into the default bucket.
How can the deployment professional remove all data stored in the "longret" bucket?
A. Manually delete old data from last week by issuing a rm * on /store/ariel/events/payloads/ and /store/ariel/events/records/ and select the directories containing events from the last week
B. Change the longret bucket period to 10 days and deploy the changes.
C. Manually delete the files ending by -1 from /store/ariel/events/payloads/ and /store/ariel/events/records/
D. Change the system's time to 2 years in the future and wait until deletion has been made and then go back to the real system's time.
Answer: B

A deployment professional needs to install a new QRadar application downloaded from the IBM Security App Exchange. Which option would the deployment professional select from the QRadar Console GUI under Admin:
System Configuration to install the downloaded application?
A. Content Management.
B. Extensions Management.
C. Customization Management.
D. Application Management.
Answer: A

0 belongs to any of them

Submit Reviews

Your content: 
Your name:  Verify Code:  feedback    
C1000-055 Practice Exam Q&A: 60 Updated: December 01,2021

Releated Certifications

IBM Security Systems

KILLTEST CONTACT INFO

[email protected]

GMT+8: Mon-Sat 8:00-18:00

GMT: Mon-Sat 0:00-10:00